AEP water level update
Per the Water Management Plan for the Claytor Project (Project), Appalachian Power Company (Appalachian) operates at a normal reservoir surface elevation of 1845-1846 feet during normal operations in the month of September. During flood operations, as is currently occurring, Appalachian may allow the Project reservoir elevation to increase above 1847.0 feet […]